# Budget, forecast and liquidity

Canonical: https://staystryk.com/en/documentation/controlling/
Language: en
Updated: 2026-11-12

This guide shows how to create a budget with the planning module, compare it with actuals, run scenarios and plan liquidity for the coming weeks.

## Before you begin

You need the View accounting permission, and to create, approve and plan you need Manage accounting.

The planning module is enabled for your hotel: Contract and modules. Then the Liquidity, Budget & forecast and Cost allocation areas appear in the reports: Reading key figures, result and balance sheet.

Accounting is set up. Actual values come from the posted journals.

## Create and compare a budget

AccountingReportsBudget & forecast

In the view, the budget is called Budget & actuals. It contains monthly values per account and hotel department. In the example, Hotel Nordlicht is planning the year 2027.

Enter the Plan year, for example 2027. The field filters the existing budgets.

Select Create budget. The Create budget window opens.

Enter a name under Plan name, for example “Budget 2027”.

Choose one of the following under Plan basis: Prior-year actuals by month, Project current-year run rate or Start blank. For the first two, enter the Source year, in the example 2026, and optionally an Overall adjustment %.

Select Create budget. STRYK reports “Budget was created.” The status is Draft.

Select Edit plan values. For each row, choose Month, Account and Hotel department or No cost centre, and enter the amount. Select Add for more rows and then Save. STRYK reports “Plan values were saved.” STRYK removes zero amounts when you save.

Under View, choose Months, Hotel departments or Accounts. The table shows Budget revenue, Budget expense, Budget result, Actual result and the Difference.

Select Approve. If the four-eyes approval is enabled, select Request approval. A second person selects Approve or Reject. With Cancel request you withdraw the request. The status is then Approved.

Use Import to create a budget from a CSV, TSV, TXT or XLSX file. Download the Template first. STRYK checks the file, and only the confirmation creates a draft. The More menu contains Copy, Reopen and Archive. With Copy you create a draft for the next year, optionally with a percentage adjustment.

The Budget monitor checks approved budgets daily against the booked actuals. You set amount and percentage as the threshold and select Check now. Deviations appear under Today as Review budget deviations.

Budget 2027 of Hotel Nordlicht with plan values per month.

Plan year

Plan values

View

Request approval

## Run a forecast

AccountingReportsBudget & forecast

Scenarios test assumptions against the budget and the booked actuals. Scenarios do not change any bookings.

Select the budget and then Scenarios. The Forecast scenarios window opens.

Select Create scenario, enter the name under Scenario name and select Create scenario.

Select Assumption and define what changes: revenue or expense, with the scope Entire value type, One hotel department or One account, as a Percentage change or Fixed monthly amount for the selected months. Percentage values apply to the adjustable remaining base. Booked actuals stay unchanged.

Optional: Enable Purchase commitments. Open purchase orders then increase the expense of the forecast.

Select Calculate. STRYK reports “Forecast calculated.” and shows Baseline forecast, Scenario result, Scenario impact, Variance to budget and Operating margin.

Select Approve if the scenario should apply.

If the budget has changed since the run, Budget changed since this run appears there. Then calculate the scenario again. The Forecast watcher checks approved scenarios daily and reports deteriorations. The notice appears under Today as a task to review the revenue forecast.

## Plan liquidity

AccountingReportsLiquidity

The Liquidity planning shows a preview of your account balance from open invoices, bookings and your own planned events. The weights are assumptions.

Select New plan. Enter the Plan name and the Planning weeks. The horizon is between 4 and 26 weeks.

Enter the Minimum reserve. If the balance falls below it, STRYK flags the week.

Set the share that comes in or goes out: Receivable collection for open outgoing invoices, Booking received for stays without an invoice and Payable execution for open incoming invoices.

Optional: Select Add event for expected payments without an invoice. Enter the Label, Category, Amount, First date, Recurrence (One-off, Weekly or Monthly), optionally an End date and the Weight. The planned amount is the amount multiplied by the weight.

Select Create plan and then Activate. STRYK reports “Liquidity plan activated.”

Select the Forecast as of date. STRYK shows the Opening balance, Inflows, Outflows, Projected closing and Lowest balance. The 13-week timeline shows the expected account balance at the end of each week, marked Below the cash reserve where applicable. Data sources lists the sources of the forecast. With Save forecast snapshot you record the state as an unchangeable snapshot.

The Liquidity watcher checks the active plan daily against the Minimum reserve and the Warning buffer. Shortfalls appear under Today as Review the liquidity shortfall.

## Allocate costs

AccountingReportsCost allocation

Cost allocation distributes overhead costs across hotel departments in a traceable way. The account totals stay the same; only the cost centres are reposted.

Select New allocation key, enter the Name and the Source cost centre, and optionally select Expense accounts.

Add two to ten Target departments with a Share using Add target. The shares must add up to exactly 100 percent.

Under Cost allocation, choose the key with Select for allocation, From and Until, and the Authorisation: Four-eyes approval or Post directly.

Select Preview and then Execute allocation. STRYK reports “Cost allocation posted.” or “Cost allocation submitted for approval.”

Under Allocation runs you find all runs with their period and proof.

## Check the result

The budget has the status Approved, and the table shows plan, actuals and the Difference.

The scenario shows the Scenario result after Calculate.

The Liquidity planning has the status Active and shows the 13-week timeline.

Deviations and shortfalls are reported under Today.

## If something does not work

“Please enter a plan name.”, The plan name is missing., Enter a name under Plan name.

“There is no budget for this year yet.”, There is no budget in the plan year., Select Create budget or Import.

“Please enter a scenario name.”, The scenario name is missing., Enter a name under Scenario name.

“Please fill in all assumptions completely.”, An assumption has empty fields., Fill in all fields of the assumption or remove it.

Budget changed since this run, The budget changed after the calculation., Select Calculate.

The liquidity watcher reports nothing., The plan is in Draft status, and the watcher only checks the active plan., Select Activate.
